EuCARD >> About EuCARD >> Project Results >> Deliverables

The EuCARD project deliverables are listed below in date order, along with links to relevant documentation when applicable.

Year 1
(April 2009 - March 2010)
Year 2
(April 2010 - March 2011)
Year 3
(April 2011 - March 2012)
Year 4
(April 2012 - March 2013)

 

Year 1

Del. no.

Deliverable name

V. no.

WP no.

Lead Bene-ficiary

Nat-ure

Dissem-ination
level

Delivery date from Annex I (proj month)

Actual / Forecast delivery date Status  Not submitted / Submitted Contr-actual
Yes / No
Comments

D2.2.1

EuCARD web site implementation

1

2

WUT, CERN

O

PU

M1
(30/04/2009)

 07/11/2008 Submitted 29/05/2009 Yes

Website

Report

D4.1.1

Continually updated AccNet web site

1

4

CERN, CNRS

O

PU

M2
(31/05/2009)

23/04/2009 Submitted 08/07/2009 Yes

Three website deliverables: AccNet, EuroLumi and RFTECH grouped into one report. Final version delayed due to overcoming a firewall issue on CNRS web server.

D4.2.1

Continually updated EuroLumi web site

1

4

CERN

O

PU

M2
(31/05/2009)

D4.3.1

Continually updated RFTECH web site

1

4

UJF, TUL

O

PU

M2
(31/05/2009)

D3.1.1

NEU2012 Website operational

1

3

INFN

O

PU

M6
(30/09/2009)

 30/09/2009 Submitted 30/10/2009 Yes

Website

Report

D10.4.1

QE data for Pb/Nb deposited photo cathode samples

1

10

DESY, SINS

R

PU

M12
(31/03/2010)


31/03/2010
Submitted 27/05/2010 Yes

Report

Year 2

Del. no.

Deliverable name

V. no.

WP no.

Lead Bene-ficiary

Nature

Dissemination level

Delivery date from Annex I (proj month)

Actual / Forecast delivery date Status / Not submitted Contractual
Yes / No
Comments

D1.1

1st periodic EuCARD report

 

1

CERN

R

PU

M20
(30/11/2010)

17/12/2010 Submitted 17/12/2010 Yes See public version of report (with financial data removed)

D4.3.2

Strategy/result for SRF test infrastructures

 

4

CERN, TUL

R

PU

M24
(31/03/2011)

 31/05/2011 Submitted
14/06/2011
Yes Report & now a booklet

D8.1.2

Collimator specification for LHC upgrade parameters

 

8

CERN, GSI

R

PU

M24
(31/03/2011)

31/08/2010 Submitted
14/06/2011
Yes Report

D8.1.3

Collimator specification for FAIR

 

8

CERN, GSI

R

PU

M24
(31/03/2011)

30/09/2010 Submitted
01/06/2011
Yes Report

D10.7.1

Results of slice measurements

 

10

FZD

R

PU

M24
(31/03/2011)

31/03/2011 Submitted
14/06/2011
Yes Report

D10.8.1

Test and operation of the couplers preparation procedure

 

10

CNRS

R

PU

M24
(31/03/2011)

31/03/2013 Not submitted Yes Will be delivered M48, with intermediate milestones. Delay not critical (3 year task with no dependencies). Delay noted in contract amendment

D11.2.1

DAFNE IR design for the upgraded KLOE detector

 

11

INFN

R

PU

M24
(31/03/2011)

31/03/2011 Submitted
30/05/2011
Yes Report

Year 3

Del. no.

Deliverable name

V. no.

WP no.

Lead Bene-ficiary

Nature

Dissemination level

Delivery date from Annex I (proj month)

Actual / Forecast delivery date Status / Not submitted Contractual
Yes / No
Comments

D8.3.2

One cryogenic collimator, tested with beam

 

8

GSI

P

PU

M30
(30/09/2011)

22/11/2011 Submitted
16/12/2011
Yes Report

D10.4.4

New thin film techniques for SC cavities and photo cathodes

 

10

ULANC

D

PU

M30
(30/09/2011)

30/09/2012 Not submitted Yes Delay noted in contract amendment

D10.2.1

Results of SC proton cavity tests (b = 1 and b = 0.65)

 

10

CEA

R

PU

M33
(31/12/2011)

31/12/2012 Not submitted Yes Delay due to cost/tendering

D10.7.2

Results for GaAs photocathodes

 

10

FZD

R

PU

M33
(31/12/2011)

31/03/2012  Not submitted Yes Milestone at M45 

D7.2.2

Thermal model for a dipole Nb3Sn model magnet

 

7

PWR

R

PU

M36
(31/03/2012)

31/03/2012    Yes  

D8.2.1

Report on modelling and materials

 

8

CERN

R

PU

M36
(31/03/2012)

31/03/2012    Yes  

D10.3.1

LHC crab cavity final report

 

10

UNIMAN

R

PU

M36
(31/03/2012)

31/07/2012    Yes  

D10.3.2

CLIC crab cavity final report

 

10

UNIMAN

R

PU

M36
(31/03/2012)

31/07/2012    Yes  

D10.3.3

LHC and CLIC LLRF final reports

 

10

UNIMAN

R

PU

M36
(31/03/2012)

31/07/2012    Yes  

D10.4.2

RF measurements on thin film deposited QRW prototype

 

10

CERN

R

PU

M36
(31/03/2012)

31/03/2013    Yes Delay noted in contract amendment

D10.4.3

Cold test results for the test cavities w/out the deposited lead photo cathode

 

10

CERN

R

PU

M36
(31/03/2012)

    Yes  

D11.2.2

Study of an IR design for LHC upgrade

 

11

INFN

R

PU

M36
(31/03/2012)

    Yes  

D11.3.1

Results from the operation of EMMA using the new diagnostics

 

11

STFC

R

PU

M36
(31/03/2012)

    Yes  

D11.4.1

Preliminary electron beam emittance measurement report

 

11

CNRS

R

PU

M36
(31/03/2012)

    Yes  

Year 4

Del. no.

Deliverable name

V. no.

WP no.

Lead Bene-ficiary

Nature

Dissemination level

Delivery date from Annex I (proj month)

Actual / Forecast delivery date Status / Not submitted Contractual
Yes / No
Comments

D1.2

2nd periodic EuCARD report

 

1

CERN

R

PU

M38
(31/05/2012)

       

D3.2.1

Performance analysis and physics potential of upgrades of existing neutrino facilities

 

3

INFN

R

PU

M40
(31/07/2012)

       

D3.3.1

Proposal of the next global accelerator neutrino facility for Europe to build or help build.

 

3

INFN

R

PU

M40
(31/07/2012)

       

D7.5.1

HTS 20 m 600 A link assembled

 

7

CERN

P

PU

M40
(31/07/2012)

       

D7.2.1

Certification of the radiation resistance of coil insulation material

 

7

PWR

R

PU

M42
(30/09/2012)

       

D8.3.1

One primary collimator with optional crystal feature, tested with beam

 

8

CERN

P

PU

M42
(30/09/2012)

       

D9.4.1

ATF2 tests and CLIC IR study

 

9

RHUL

R

PU

M42
(30/09/2012)

       

D10.6.1

Report on system test and performance

 

10

DESY

R

PU

M42
(30/09/2012)

       

D9.5.1

RF phase monitor final report

 

9

INFN

R

PU

M45
(31/12/2012)

       

D9.4.2

Laser Wire and Beam Position Monitor tests

 

9

RHUL

R

PU

M46
(31/01/2013)

       

D2.1.1

Final report of WP2 DCO

 

2

WUT, CERN

R

PU

M48
(31/03/2013)

       

D2.2.2

Final plan for the use and dissemination of foreground

 

2

WUT, CERN

R

PU

M48
(31/03/2013)

       

D3.1.2

Final NEU2012 guidelines for an accelerator neutrino experiments programme

 

3

INFN

R

PU

M48
(31/03/2013)

       

D4.1.2

AccNet Strategy for future proton & electron facilities in Europe

 

4

CERN, CNRS

R

PU

M48
(31/03/2013)

       

D4.2.2

EuroLumi Strategy and issues for LHC IR, LHC injector and beam-parameter upgrade path(s), with comment on longer-term prospects, and for FAIR

 

4

CERN

R

PU

M48
(31/03/2013)

       

D4.3.3

RFTECH strategy/result for cavity design, LLRF & HPRF systems and design integration, and costing tools

 

4

CERN, TUL

R

PU

M48
(31/03/2013)

       

D7.1.1

HFM web-site linked to the technical & administrative databases

 

7

CERN, CEA

O

PU

M48
(31/03/2013)

       

D7.3.1

Dipole model test results analyzed

 

7

CEA

R

PU

M48
(31/03/2013)

       

D7.4.1

A HTS dipole insert coil constructed

 

7

CNRS

D

PU

M48
(31/03/2013)

       

D7.6.1

Final prototype SC helical undulator measured

 

7

STFC

R

PU

M48
(31/03/2013)

       

D8.1.1

ColMat web-site linked to the technical and administrative databases

 

8

CERN, GSI

O

PU

M48
(31/03/2013)

       

D9.1.1

NCLinac web-site linked to the technical and administrative databases

 

9

CERN, RHUL

O

PU

M48
(31/03/2013)

       

D9.2.1

Simulation and experimental results with report on the theoretical and scientific aspects of the CLIC module

 

9

CERN

R

PU

M48
(31/03/2013)

       

D9.2.2

Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module.

 

9

CERN

P

PU

M48
(31/03/2013)

       

D9.3.1

CLIC Quadrupole Module final report

 

9

CNRS

R

PU

M48
(31/03/2013)

       

D9.3.2

Final Focus Test Stand final report

 

9

CNRS

R

PU

M48
(31/03/2013)

       

D9.5.2

Electro optical monitor final report

 

9

INFN

R

PU

M48
(31/03/2013)

       

D10.1.1

SRF web-site linked to the technical and administrative databases

 

10

DESY, CEA

O

PU

M48
(31/03/2013)

       

D10.5.1

HOM electronics and code to probe beam centring on 3.9 GHz cavities

 

10

DESY

R

PU

M48
(31/03/2013)

       

D10.5.2

Report on HOM experimental methods and code

 

10

DESY

R

PU

M48
(31/03/2013)

       

D11.1.1

ANAC web-site linked to the technical and administrative databases

 

11

INFN

O

PU

M48
(31/03/2013)

       

D1.3

3rd periodic EuCARD report 

 

1

CERN

R

PU

M50 (31/05/2013)

       

D1.4

Final project report

 

1

CERN

R

PU

M50
(31/05/2013)